Commissioning Agreement.

start
 
Account number *

Do you have an account with us?

 
Account number *

Please insert your account number below:
 
Billing details

 
Full company name: *

 
Company registration number:

 
Contact Name: *

 
Full Company Address: *

 
Postcode: *

 
Telephone: *

 
Fax:

 
Accounts invoice/statement to be received by email:

     
 
Site Details (where work is to be carried out)

 
Are the site details where work is to be carried out the same as the billing address? *


 
Full Company Name: *

 
Full Company Address: *

 
Postcode: *

 
Opening Times

 
Company brands to be covered *


 
Commissioning AmbiRad Benson Airbloc Reznor

It is the installers responsibility to ensure that the heaters and associated equipment are installed to the relevant manufacturers recommendations as stated in the installation manual . 
The list below is to be completed and returned as part of the agreement form.

Please be aware that any heaters controlled by a BMS system must have an engineer on-site from the control company at the time of commissioning.

PLEASE ENSURE A REPRESENTATIVE FROM THE INSTALLER IS ON-SITE AT THE TIME OF COMMISSIONING TO SIGN WORK SHEET (CORGI REQUIREMENT)
 
Commissioning
Our Rates are £150.00 (plus unit(s) charge below)
Unit prices are based on 1-10 units. If there are more units onsite please contact us for revised quote. *

Please select the unit for work to be carried out

 
Please insert the number of units for work to be carried out on:

*

 
ERO Number (Original reference number supplied to you when ordering the equipment):

Supply if known
 
Is access clear to all burners, heaters and fans? *


 
Is the electrical power available via a local electrical isolator? *


 
Is the gas service fully connected, tested and purged? *


 
Are the gas flexs installed to I.G.A.E and manufacturers recommendations? *

(NRV and Radiant only)

 
Are the system dampers installed and located correctly? *

(NRV and Radiant only)

 
Have burner and heater clearances been observed? *


 
Are the reflectors and supports installed correctly? *

NRV and Radiant only

 
Have the flue fans been fitted correctly? *

NRV and Radiant only

 
Are the flue fans installed correctly and supported as per burners and heaters recommendations? *


 
Are the ball guards installed correctly? *

NRV and Radiant only

 
Are the controls systems connected, available and fully commissioned? *


 
Will a controls engineer be on site? *

* A controls engineer is mandatory if controls are not supplied by us. e.g. BMS

 
Please provide in writing, what ventilation (cm2) has been allowed for: *

(please refer to British standards)
 
It's mandatory that access is supplied by the client when we are requested to undertake commissioning of units. Please confirm access will be made available? *


 
*Commissioning At the agreed rate of £700.00 ex vat, per day/unit. Any time spent waiting will be charged extra. All paper work must be returned completed and signed before any appointments can be confirmed. Any abortive visits due to the the unit not b

 
Please indicate the model of the unit(s) you would like us to carry out work on: *

 
Please indicate the quantity of unit(s) you would like us to carry out work on: *

 
Please indicate the serial number on the unit(s) you would like us to carry out work on: *

 
ERO Number (Original reference number supplied to you when ordering the equipment): *

Supply if known
 
It's mandatory that access is supplied by the client when we are requested to undertake commissioning of units. Please confirm access will be made available? *


 
Commissioning Pre-Checklist Nordair Niche

It is the installers responsibility to ensure that the heaters and associated equipment are installed to the relevant manufacturers recommendations as stated in the installation manual . 
The list below is to be completed and returned as part of the agreement form. We will not attend site until we receive this confirmation back.

If the heaters are controlled by a BMS system, an engineer from the controls company will be required on-site at the time of commissioning.

PLEASE ENSURE A REPRESENTATIVE FROM THE INSTALLER IS ON-SITE AT THE TIME OF COMMISSIONING TO SIGN WORK SHEET (CORGI REQUIREMENT)
 
Is the electrical power available via a local electrical isolator? *


 
Is the gas service fully connected, tested and purged? *

If yes please send us a copy

 
Is the control system fully wired with all external connections? *


 
Does the ventilation meet requirements? *


 
Is the remote control panel fitted? *


 
Is the room sensor fitted & wired back to the heater control panel? *

NRV and Radiant only

 
Is the internal wiring complete? *

(If we have to carry out this work additional charges may apply)

 
What controls are being used? *

 
Is the installation complete? *

(NRV and Radiant only)

 
Any further information please:

 
Site contact name: *

 
Site contact telephone: *

 
Please confirm type of access equipment supplied: *

 
What is the mounting height of the unit from the floor: (m) *

 
Are the units accessible from all sides or within an enclosed space? *

 
Is a risk assessment and method statement required? *

     
 
Site induction required? *

     
 
Induction time & location: *

 
Is adequate van parking available (if not please give details) *

 
Preferred date for the work to be carried out. *

 
Confirmation

Charges are set out as included within this agreement. An additional charge of £75.00 an hour may apply if access to the equipment is prohibited, or site delays are experienced.

We confirm the data contained within this form is accurate to the best of our knowledge. We accept that we may be liable for additional charges should the information be inaccurate.
 
Name: *

 
Date *

 
Purchase order number: *

Form invalid if not provided.
Thank you for taking the time to complete this form.
again
Powered by Typeform
Powered by Typeform